Panania (iCare Insurance)

About Project

  • Duplex’s constructed in 2017
  • Original Scope of Works in 2020 listed the following items:
  • Failure of Waterproofing to two front balconies
  • Failure of Waterproofing  to two rear balconies
  • Failure of vertical articulation joints
  • Weep holes not evident below sill bricks
  • Electrical works
  • At commencement of remedial works a 2nd Scope of Works was required to remediate the following items
  • Waterproofing to two main bathrooms and two ensuites
  • Replacement of beams to all balconies
  • Further variation required when brick columns were found not to be tied to main building or balcony beams.