Petersham (iCare Insurance)

About Project

  • After renovations, new first floor bathroom was leaking through to ground floor kitchen ceiling
  • Remove and set aside all existing fittings and furniture
  • Remove and dispose of all wall and floor tiling.
  • Remove existing plastic plumbing lines (not to code) in brick walls and install copper lines
  • Repair rubble fill to certain area of walls
  • Make good to all surfaces
  • Install and certify two layers of waterproofing to code
  • Supply and install new wall and floor tiling
  • Repair and paint surfaces where applicable
  • Reinstall all fittings and fixtures
  • Repair and paint all damaged areas of kitchen ceiling.