Alexandria Roof Waterproofing

About Project

Replacement of Existing Roof Membrane

  • A new roof membrane was installed 1 year ago but has subsequently failed and had to be removed
  • Removal of self leveling patches
  • Grind substrate to remove all previously installed glue and bitumen product
  • Install new water inhibitor around courtyard balconies
  • Prime and then waterproof (2 coats) approx. 140m2
  • Core drill 4 new drainage spitters into concrete parapet walls
  • Supply and install new screed with falls to drainage outlets
  • Prime the entire area
  • Supply and install 2 layers of trafficable waterproofing.